Skip to content
AHMED KHALAWYQuality · Mechanical Engineering
Explore my CVPDF · 4 pages · 207 KB

My experience, in four original pages

Open my CV.

Turn the page at either edge. Use ← →, swipe, or choose a page below.

Private review

Explore my portfolio

Explore my CVPDF · 4 pages · 207 KB

My experience, in four original pages

Open my CV.

Turn the page at either edge. Use ← →, swipe, or choose a page below.

Private review
Review assistant

Work & review areas

Start with the capability. Go deeper with evidence.

Four capabilities, each with a result, a picture of how the work was organized and what I did. Full company cases, original records and images open in a private review room.

Explore my CVPDF · 4 pages · 207 KB

My experience, in four original pages

Open my CV.

Turn the page at either edge. Use ← →, swipe, or choose a page below.

Interactive work explorer

Choose the context.
Follow the evidence.

Browse public work summaries by company, capability and career period. Your view and filters stay in the URL.

Career period overlaps 2018–2026

Drag either handle. Tab between From and To; use the arrow keys to adjust a year. Start and end can share a year.

17 of 17 public summaries

Compare selected evidence 0 / 3

Your review shortlist

Compare public work evidence

Choose up to 3 summaries for a focused review. The career timeline and all results stay in their original order.

0 / 3 selected

Use “Add to comparison” on a work summary to build your shortlist. You can continue browsing without selecting anything.

Connect inspection plans to manufacturing acceptance · illustrative engineering scene · illustrative method diagramIncomingProcessFinal
Inspect incoming, process and final acceptanceFinal acceptanceIllustrative method

Eibla for Energy

Connect inspection plans to manufacturing acceptance

I connected inspection plans and acceptance criteria across incoming materials, manufacturing, assembly and final acceptance.

3 operating areasMechanical factory · electrical factory · warehouse
Explore this work
Prepare testing and conformity evidence · illustrative engineering scene · illustrative method diagram
Connect mechanical, coating and electrical checks to evidenceCollect the test recordsIllustrative method

Eibla for Energy

Prepare testing and conformity evidence

I coordinated type-testing preparation, conformity documentation and measurement control across mechanical, coating and electrical requirements.

PreparationType-testing preparation and conformity documentation
Explore this work
Control first-piece release and pressing checks · illustrative engineering scene · illustrative method diagramInspect in sequenceRelease gate
Check three conforming units before opening a release gateOpen the release gateIllustrative method

ELARABY Group

Control first-piece release and pressing checks

I controlled first-piece release, in-process inspection and operating parameters across progressive, mechanical and hydraulic presses.

First 3 unitsConforming units required before critical line release
Explore this work
Ejector design for different fluids · illustrative engineering scene · illustrative method diagramNozzleMixingDiffuser
Follow nozzle, mixing and diffuser flow pathsDiffuserIllustrative method

Menoufia University · graduation project

Ejector design for different fluids

I led a Mechanical Power Engineering graduation team, connecting preliminary SolidWorks and ANSYS Fluent research to real steam, air and water measurements.

Team leadGraduation team project · Menoufia University · 2018
Explore this work
My private review · illustrative locked evidence library · illustrative method diagram
Follow an invitation boundary to an illustrative evidence indexRetain the protected context

The next layer of my work

More context.
Access by invitation.

I keep company-specific cases, original records and sensitive evidence in my private review room. My public summaries give you the starting point; a tailored review connects the relevant evidence to your role.

  • 🔒 Company-specific cases
  • 🔒 Original records
  • 🔒 Guided evidence review

01 · Build the system. Develop the team.

Quality leadership

Quality planning, inspector capability, audit readiness and cross-functional problem solving.

Today at Yuksel Saudia: corporate QMS/ITP coordination, controlled documentation and department coaching.

  • QMS
  • 8D / CAPA
  • Skills matrices
  • Audit readiness
Open quality leadership evidence

02 · Make acceptance repeatable.

Inspection & measurement

Incoming, in-process and final inspection, calibration, reference samples and measurement-system analysis.

At Eibla: incoming, process and final inspection, connecting engineering requirements to practical acceptance checks.

  • Inspection plans
  • Calibration
  • Gage R&R
  • SPC
Open inspection & measurement evidence

03 · Connect variation to action.

Manufacturing improvement

Process trials, defect containment, controlled changeovers and data-led improvement across manufacturing operations.

Eibla adds customer-readiness and 8D follow-up; Yuksel Saudia adds Power BI reporting and cross-functional evidence review.

  • Root-cause analysis
  • DOE
  • COPQ
  • Power BI
Open manufacturing improvement evidence

04 · Keep the intended configuration.

Engineering & release control

Drawing interpretation, SolidWorks reverse engineering, governing dimensions, BOM checks and development-sample release.

At El Araby, model-change release checked material identity, BOM-stage quantities, instructions, testing and packaging.

  • SolidWorks
  • BOM checks
  • Change control
  • Development samples
Open engineering & release control evidence

Mechanical engineering foundation · 2018

Ejector Design
for Different Fluids.

A Mechanical Power graduation team project at Menoufia University, connecting preliminary research, modelling and real measurements.

Illustrated viewOriginal illustrative schematic · not a CAD model or CFD output
Driving streamEntrained stream

Nozzle

The driving stream passes through the nozzle. Its jet provides the momentum that draws a second stream into the ejector.

Mixing chamber

The driving and entrained streams meet in the mixing region. Geometry and operating conditions affect how that exchange develops.

Diffuser

The expanding outlet slows the combined stream and supports pressure recovery. This schematic explains the arrangement; it does not show a measured result.

My contribution

Lead the team.
Connect the model
to the experiment.

I led the graduation-project team and presented the preliminary research using SolidWorks and ANSYS Fluent. My contribution included researching the equipment and models, taking real steam, air and water measurements, and presenting the project to the committee.

  1. Research

    Preliminary study and equipment/model research.

  2. Model

    SolidWorks and ANSYS Fluent as part of the project work.

  3. Measure

    Real steam, air and water measurements.

  4. Present

    Team leadership and presentation to the committee.

Actual 2018 graduation ejector test rig with a metal body, tubing and a multi-tube pressure board.

The instrumented test rig

The team report documents the physical ejector assembly and the instruments used to observe the flow.

Original project photograph · 2018Open full-resolution the instrumented test rig
Metal ejector prototype on a laboratory bench with pressure-tap ports along the body.

Prototype & pressure taps

A real prototype from the project archive, with ports for pressure measurements along the ejector.

Original project photograph · 2018Open full-resolution prototype & pressure taps
Laboratory U-tube manometer mounted on a vertical measurement board.

Pressure measurements

Physical instrumentation used in the graduation study. These photographs show the apparatus, without implying a new performance claim.

Original project photograph · 2018Open full-resolution pressure measurements

The operating model · interactive

One system.
Four connected decisions.

Explore the stages. The mechanism responds to your selection; the quality practice remains readable beside it.

Define what acceptable means.

Translate product and project requirements into controlled documents, inspection plans and clear acceptance criteria.

  • QMS
  • ITP
  • Drawing control
Original engineering illustration

Original decorative engineering assembly. It is an interactive explanation of the operating model, not an employer drawing or a product I manufactured.

Where the work happened

Each context, clearly attributed.

Manufacturing, construction and digital work each appear with their own company context and their own results.

Review all company contexts
Yuksel Saudia logoYuksel SaudiaEmployer

Yuksel Saudia

I coordinate corporate quality systems, controlled documentation, audit readiness and infrastructure reporting.

Eibla for Energy logoEibla for EnergyEmployer

Eibla for Energy

I led quality across mechanical manufacturing, electrical-panel assembly and warehouse operations.

ELARABY Group logoELARABY GroupEmployer

ELARABY Group

I built factory QC systems and progressed to Assistant Manager, connecting team capability, inspection and process improvement.

Independent engineeringMy professional identity

Freelance / Independent Engineering

My independent work included SolidWorks training, engineering drawings and database development for local organizations.

ProDigi ConsultMy digital practice

ProDigi Consult

I present my workflow design, reporting and operational tools as a separate body of work. My selected Power BI and workflow demonstrations use sample data.

Continue the review

Start with the role.
Explore the relevant evidence.

A private room can focus on the work that matters to your hiring decision.